橘子朗文词典
简体 繁體

construction period

C 开头单词

基本解释

  • [建] 施工期

英汉例句

    双语例句

  • There exist some misunderstandings in dealing with these suspended components during the construction period.
    施工人员在施工期间如何处理这些构件的问题上常存在着一些误解。
  • Thus, stable hole, smooth drilling and tripping operations and zero outage time have been obtained in the construction period.
    使该井在施工期间,井壁稳定、起下钻井眼畅通,全井事故、复杂时效均为零。
  • This month Suez Canal managers will announce that they plan to offer discounts during the construction period of the enlarged Panama Canal.
    本月,苏伊士运河管理人员将宣布,他们计划在巴拿马运河扩建期间提供折扣(不太清晰,能不能说提供优惠服务)。
  • 原声例句

  • "In the moratorium just announced by the government of Israel, there will be no new housing construction starts during the 10-month period.,"
  • 权威例句

  • Meanwhile, during the same period, construction jobs rose from 7.2% to 7.5% and the sum of service sector and government employment rose from 40.8% to 41.1%.
    FORBES: Brazil: A Bubble In Labor Markets
  • They insist that there were only 4 "incidents" in that period and only 22 since construction began.
    FORBES: Magazine Article
  • construction period更多例句

词组短语

    短语

  • construction preparation period 施工准备阶段
  • Construction prepare period 施工准备期
  • Construction Target Period 施工目标期
  • project construction preparing period 项目实施准备阶段
  • construction work period 建设工期
  • construction period更多词组

专业释义

    经济学

  • 建设期
  • 建设工期
  • 施工工期
  • 交通运输工程

  • 施工期

    The life cycle of concrete bridges consists of three periods, i. e. , construction period, service life and degradation process. The failure probability of cable-stayed bridges during construction is higher than that during service life.
    混凝土桥梁结构的生命全过程可分为施工期、使用期、老化期三个阶段,现行规范主要针对正常使用阶段,对施工期的可靠性研究还很少。

  • 施工工期

    The construction period risk is one of the important reason of leading to project delays’resulting in the project progress’ the quality and the investment object out of control.
    施工工期的风险是导致工程延误,造成项目进度、质量和投资目标失控的重要因素之一。

  • 建设期
  • 施工阶段

    Design and analysis of the survey methods in the construction period of Yangzi River channel of Nanjing.
    4.对南京长江过江通道工程施工阶段的测量方法进行了设计和分析。

    土木建筑工程

  • 施工期
  • 施工工期
  • 水利工程

  • 施工工期

    We make comparison based on investment,construction techniques,construction period and impact on environment by the Shield-driven Tunnel and Mined Tunnel schemes after analyzing geological condition in the region.
    在历次线路规划、方案比选工作中有切岗线方案、绕岗线方案、隧洞线方案等。 对隧洞线,在已有地质资料基础上又进行了补充地质勘察工作,并分别对盾构法、矿山法隧洞设计方案从施工技术难易程度、施工工期、对环境的影响及投资等方面进行了比较、分析、研究,结果选定盾构法圆型无压隧洞2条隧洞方案。

    能源科学技术

  • 工期
  • 上一篇
  • 下一篇
热门奈飞电影 奈飞网剧 最新奈飞网剧 奈飞网剧剧情 奈飞电影剧情 热门奈飞网剧 迪士尼电影 热门迪士尼电影 迪士尼电影剧情 最新迪士尼电影 热门免费短剧 华纳电影 最新华纳电影 热门华纳电影 华纳电影剧情 游戏赢 菜谱大全 成语接龙 名字大全 年龄计算器 netflix电影 吉他入门学习 热门netflix电影 netflix电影剧情 netflix电影 吉他谱大全 钢琴谱大全 简谱大全 美国大片

橘子词典 · www.6s-iso.com